Skip to main content
← All guides

TxDOT Item 247 flexible base: a contractor buying checklist

Specify the contract edition, type, grade and required test reports before purchasing flexible base for a Texas public works project.

Scope
Commercial specifications
Pricing
Current catalog; freight and tax separate
Approval
Match the grade to your project

Start with the governing contract

TxDOT Item 247 is a flexible-base specification, not a certification attached to every product called flex base. Use the edition incorporated into your contract, the project plans and any special provisions. Municipal, county and private projects may specify different requirements. Send the actual schedule and specification pages with your request.

Type and grade are separate decisions

The plans identify required material type and grade. Gradation, plasticity and other acceptance requirements vary; there is no single PI or universal grade that qualifies every project. Limestone, natural material and recycled concrete are not automatically equivalent. Recycled content must be permitted by the governing documents and the proposed material must meet them.

Request the right evidence

Ask for the source and product identification, sample date, report date, applicable test methods and results required by the contract. Depending on the specified grade, review gradation, liquid limit, plasticity index and wet ball mill requirements. A marketing sheet or an old report for another grade does not establish compliance for the delivered material.

Keep quantity tied to compacted design

Bid quantities can refer to compacted volume while delivery is sold by weight. Confirm the intended measurement basis and a justified loose-to-compacted conversion with the responsible professional. Our live density is a planning input, not a laboratory compaction result. Do not turn compacted cubic yards into a firm tonnage using a guessed allowance.

Release only after project approval

Submit the proposed material package to the approving engineer or agency before purchasing specified work. Record the approval, approved grade and relevant report so substitutions cannot happen silently. Availability, freight, taxes and phased deliveries need separate confirmation. CTM supplies and delivers material; it does not issue agency approval.

Materials we deliver for this project

Current material prices and minimums. Confirm the grade for your project; delivery and sales tax are separate.

Quantity planning examples

Example dimensions only, not recommended installation depths. Prices and minimums come from the current catalog. No compaction or waste allowance is added; delivery and sales tax are separate.

Example / materialVolumeEstimated tonsOrder tonsMaterial subtotal

Geometric layer, 100 × 12 ft at 6 in

Limestone Flex Base - Standard
22.22 yd³34.4434.45 3-ton min$895.70

Geometric layer, 100 × 12 ft at 6 in

Caliche Road Base
22.22 yd³33.3333.34 5-ton min$666.80

Tonnage calculator

Enter your area and depth to see how many tons you need. Pick a material to use its real planning density. Confirm moisture and compaction needs for your site.

Auto-filled from Limestone Flex Base - Standard (1.55 t/yd³ · 3,100 lb/yd³). Override only if you know your source density.

Enter a length, width, and depth to calculate how many tons you need.

Planning estimate only. Actual tonnage varies with moisture, compaction and source. Material minimums apply; freight and sales tax are separate. Beyond 40 miles, delivery needs a confirmed address-specific quote. Dispatch confirms truck access and the requested date.

Delivery across Central Texas

Check your town and ZIP, then share the actual address, access restrictions and requested date. Dispatch confirms material availability, suitable equipment and timing. Freight outside confirmed haul bands requires an address-specific quote.

Further specification guidance

Contractor submittal templates

Project cover sheet and laboratory test request. Blank templates only; attach actual reports and obtain project approval.

Download the CTM submittal package

More guides