Skip to main content
← Material catalog
Central Texas MaterialsBulk material delivery

Contractor resources

Contractor material submittals

Prepare a project-specific material submission for your contractor, engineer or utility owner. Keep the proposed grade, governing specification and original test reports together.

Contractor intake

Submit specifications & request pricing

Send the project requirements for review. Material pricing, freight, applicable tax and available supporting reports will be confirmed separately. Submission is not an order or material approval.

Share a read-only link, or email attachments to anthony@centraltexasmaterials.com.

No payment required. Delivery dates require dispatch confirmation.

Templates, not certifications. The laboratory issues test results. Your project’s engineer or agency determines acceptance. These blank forms do not certify a material or imply that any CTM product is already approved.

Download the templates

Material submittal cover sheet

Project and reviewer details, exact grade, specification reference and attached-report checklist.

US Letter · 1 page · 16 fillable fields and checkboxes · PDF

Download cover sheet

Laboratory test request

Sample traceability, required tests, acceptance criteria references and laboratory reporting instructions.

US Letter · 1 page · 14 fillable fields and checkboxes · PDF

Download lab request

Before submitting

  1. 01

    Confirm the governing requirements

    Record the actual city, utility owner, project specification and edition. Austin requirements do not automatically apply to Boston or another jurisdiction.

  2. 02

    Identify the proposed material

    Use the exact grade and source or lot reference where required. A trade name such as bed sand, flex base or select fill is not an approval.

  3. 03

    Request traceable laboratory evidence

    Confirm sampling, chain of custody, required test methods, laboratory qualifications and any required signature or seal before commissioning testing.

  4. 04

    Attach the original records

    Include the unaltered laboratory report, relevant specification pages and required source details. Keep reviewer approval separate from laboratory results.

Specification guidance

Need a project-specific material package?

Share the specification, exact grade, quantity, project jurisdiction and requested delivery date. CTM can coordinate available supporting information; tests, report availability and approval must be confirmed for the actual project.

Dispatch: (737) 259-5494