Job-site haul-off & excess fill

Have excess soil or natural rock to remove from your job site? Request a reviewed haul-off plan through CTM dispatch.

I have excess material to haul off

Your contact details
Origin site & surplus material

Proposed haul-off rates

Planning prices, not confirmed hauling costs or a binding quote. Dispatch must approve the route, truck capacity and both sites.

Trucking / minimum job
$325.00 per load, up to 20 one-way route miles
21–40 route miles
$5.00 per additional mile per load
Loading / unloading wait
30 minutes per load included; $150.00/hour beyond that, rounded up to 15 minutes
Scheduled site visit
$95.00 per visit when required and accepted
Blocked-access dry run
$200.00 per truck, only if stated in the accepted job confirmation
Late cancellation
$150.00 per truck within 24 hours, only if stated in the accepted job confirmation

Disposal / receiving fees, purchased fill, excavation, loading equipment, testing, permits and applicable tax are separate and require confirmation. Over 40 miles is by quote. No assumed tons or cubic yards per load. CTM weather rescheduling has no cancellation charge. Dry-run and cancellation charges are not both charged for the same event.

Your itemized planning price

Enter estimated loads and route miles for a planning subtotal. Unknown destination, truck capacity or routes over 40 miles require staff pricing.

Disposal / receiving fees and tax are not included or assumed free. This is not a payable quote. Loads are your estimate, not converted from the quantity above.

No hazardous, contaminated or regulated waste. Unknown soil conditions and engineering requirements need review before hauling. Final pricing and dates require written confirmation.